Project Data
Location | Tsim Sha Tsui, Hong Kong |
Client | New World Development |
Distributor | Advanced Trading (Asia) Limited |
Contractor | Tong Kee Engineering Limited |
Products | SeaShield 100™ System and SeaShield 2000FD™ System |
Date | 2018 |
Project Details
The Avenue of Stars – styled upon the Hollywood Walk of Fame – is one of Hong Kong’s most iconic tourist destinations. The promenade wraps around Tsim Sha Sui’s southern border and provides stunning views of the Hong Kong skyline across Victoria Harbour.
During a period of redevelopment, the SeaShield 100™ System was applied to 93 jetty piles that were each 1150mm in diameter. In addition to this, the SeaShield 2000FD™ System was applied to protect a further 16 piles of 2000mm diameter each. Both systems can be applied above and below water and offer robust protection to jetty piles that are exposed to the corrosive conditions found in splash zone, inter-tidal and subsea environments.
Work to protect the existing jetty piles was completed in 2018. The avenue reopened to the public in 2019.
![The Avenue of Stars promenade in Hong Kong](https://www.denso.net/wp-content/uploads/2024/06/SeaShield-2000FD-100-System-_Hong-Kong-_DL_Avenue-of-Stars-Revitalisation-_2018_2.png)
The Avenue of Stars, Hong Kong.
![The condition of an existing jetty pile suffering from corrosion, and high pressure water jetting utilised to prepare the jetty pile before application of a SeaShield System](https://www.denso.net/wp-content/uploads/2024/06/SeaShield-2000FD-100-System-_Hong-Kong-_DL_Avenue-of-Stars-Revitalisation-_2018_7.png)
Condition of an existing pile (left). High pressure water jetting is used to prepare the surface before system application (right).
![Denso Marine Piling Tape applied to a submerged jetty pile and a tough HDPE jacket is positioned around the pile on top of the tape layer.](https://www.denso.net/wp-content/uploads/2024/06/SeaShield-2000FD-100-System-_Hong-Kong-_DL_Avenue-of-Stars-Revitalisation-_2018_1.png)
Denso Marine Piling Tape is the primary corrosion prevention layer (left). This is followed by a HDPE Jacket in both systems (right).
![The Avenue of Stars promenade in Hong Kong](https://www.denso.net/wp-content/uploads/2024/06/SeaShield-2000FD-100-System-_Hong-Kong-_DL_Avenue-of-Stars-Revitalisation-_2018_6.png)
The Avenue of Stars, Hong Kong.
![Close up view of a completed application of the SeaShield 100 System to jetty piles on the Avenue of Stars](https://www.denso.net/wp-content/uploads/2024/06/SeaShield-2000FD-100-System-_Hong-Kong-_DL_Avenue-of-Stars-Revitalisation-_2018_3.png)
View of a completed SeaShield 100 System application, with banding, on jetty piles supporting the promenade.
![The Avenue of Stars promenade in Hong Kong](https://www.denso.net/wp-content/uploads/2024/06/SeaShield-2000FD-100-System-_Hong-Kong-_DL_Avenue-of-Stars-Revitalisation-_2018_5.png)
The Avenue of Stars, Hong Kong.
![The Avenue of Stars promenade in Hong Kong](https://www.denso.net/wp-content/uploads/2024/06/SeaShield-2000FD-100-System-_Hong-Kong-_DL_Avenue-of-Stars-Revitalisation-_2018_4.png)
The Avenue of Stars, Hong Kong.
![The Avenue of Stars promenade in Hong Kong](https://www.denso.net/wp-content/uploads/2024/06/SeaShield-2000FD-100-System-_Hong-Kong-_DL_Avenue-of-Stars-Revitalisation-_2018_2.png)
The Avenue of Stars, Hong Kong.
![The condition of an existing jetty pile suffering from corrosion, and high pressure water jetting utilised to prepare the jetty pile before application of a SeaShield System](https://www.denso.net/wp-content/uploads/2024/06/SeaShield-2000FD-100-System-_Hong-Kong-_DL_Avenue-of-Stars-Revitalisation-_2018_7.png)
Condition of an existing pile (left). High pressure water jetting is used to prepare the surface before system application (right).
![Denso Marine Piling Tape applied to a submerged jetty pile and a tough HDPE jacket is positioned around the pile on top of the tape layer.](https://www.denso.net/wp-content/uploads/2024/06/SeaShield-2000FD-100-System-_Hong-Kong-_DL_Avenue-of-Stars-Revitalisation-_2018_1.png)
Denso Marine Piling Tape is the primary corrosion prevention layer (left). This is followed by a HDPE Jacket in both systems (right).
![The Avenue of Stars promenade in Hong Kong](https://www.denso.net/wp-content/uploads/2024/06/SeaShield-2000FD-100-System-_Hong-Kong-_DL_Avenue-of-Stars-Revitalisation-_2018_6.png)
The Avenue of Stars, Hong Kong.
![Close up view of a completed application of the SeaShield 100 System to jetty piles on the Avenue of Stars](https://www.denso.net/wp-content/uploads/2024/06/SeaShield-2000FD-100-System-_Hong-Kong-_DL_Avenue-of-Stars-Revitalisation-_2018_3.png)
View of a completed SeaShield 100 System application, with banding, on jetty piles supporting the promenade.
![The Avenue of Stars promenade in Hong Kong](https://www.denso.net/wp-content/uploads/2024/06/SeaShield-2000FD-100-System-_Hong-Kong-_DL_Avenue-of-Stars-Revitalisation-_2018_5.png)
The Avenue of Stars, Hong Kong.
![The Avenue of Stars promenade in Hong Kong](https://www.denso.net/wp-content/uploads/2024/06/SeaShield-2000FD-100-System-_Hong-Kong-_DL_Avenue-of-Stars-Revitalisation-_2018_4.png)