CASE STUDY
BassGas Onshore Pipeline Project
Buried Coatings
Project Data
Location | Australia |
Client | Origin Energy |
Engineers | Clough Engineering |
Contractor | A J Lucas |
Products | Premier Butyl Tape System™ |
Date | 2004 |
Project Details
After much time and rigorous material testing, Clough Engineering chose and specified Denso’s 3 Ply Premier Butyl Tape System S43/R23™, for the girth weld joint coating on the BassGas Onshore Project.
This project involved Denso providing joint protection for a 32km x 10” Ø multi-phase flow pipeline which is carrying domestic gas from the Lang Lang Gas Plant to Pakenham tying into the regional gas grid here in Victoria. Despite an initially “higher” purchase cost to similar alternative coatings, Clough Engineering insisted on using the Denso S43/R23 System to ensure coating integrity is not compromised.
The project was completed with all parties (being Clough Engineering – (Managing Engineers), Origin Energy (owners) and A J Lucas (Contractors) happy with the performance of our product.