CASE STUDY
Densoclad 70HT™ Tape Provides Long-Term Protection to Fire Water Pipeline in Qatar
Buried Coatings
Project Data
Location | Halul Island, Qatar |
Client | QP |
Agent | Al Tayeb Water Technology W.L.L. |
Contractor | Galfar Al Misnad |
Consultant | Worley Parsons & Venture Engineering Co W.L.L. |
Products | Denso Primer D™, Densoclad 70HT™ |
Date | May 2015 |
Project Details
Denso Primer D™ and Densoclad 70HT™ Tape were chosen to give long-term protection to a 8’’ diameter buried carbon steel fire water pipeline on Halul Island in Qatar.
![Halul Island 2015](https://www.denso.net/wp-content/uploads/2020/05/Halul-Island-2015_1.jpg)
Application of Densoclad 70HT™ Tape to Fire Water Pipeline
![Halul Island 2015](https://www.denso.net/wp-content/uploads/2020/05/Halul-Island-2015_2.jpg)
The 8" diameter pipe protected with Denso Primer D™ and Densoclad 70HT™ Tape.
![Halul Island 2015](https://www.denso.net/wp-content/uploads/2020/05/Halul-Island-2015_1.jpg)
Application of Densoclad 70HT™ Tape to Fire Water Pipeline
![Halul Island 2015](https://www.denso.net/wp-content/uploads/2020/05/Halul-Island-2015_2.jpg)