CASE STUDY
Southend-on-Sea Outfall Pipe protected with SeaShield 70/80™ System
SubSea & Splash Zone Coatings
Project Data
Location | Southend-on-Sea, UK |
Client | Anglian Water |
Products | SeaShield 70/80™ System |
Contractor | Red7 Diving |
Date | March 2022 |
Project Details
Due to our track record and surface tolerant systems, Winn & Coales (Denso) Ltd was recently specified for the protection of 10m of an exposed outfall pipe located in Southend-on-Sea.
The outfall pipe in question was showing signs of corrosion and erosion due to the stoney beach and foot traffic in the vicinity. The Denso SeaShield 70/80™ System, comprising Denso Paste S105™, SeaShield™ Marine Piling Tape, Densoclad 70™, Denso Glass Outerwrap UV™ (GOW UV) and Poly-wrap, was proposed and accepted as it not only provides effective corrosion prevention but mechanical and UV protection too.
The function of the Poly-wrap is to provide sufficient time and tension for the GOW UV to cure. The Polywrap is removed and suitably disposed of once the GOW UV has fully cured, leaving a smooth, hard outer layer that protects the completed system from wave action and debris.
![SeaShield 70/80 System](https://www.denso.net/wp-content/uploads/2022/04/Work-in-progress.png)
Undertaking work on the Southend-on-Sea outfall pipe.
![SeaShield 70/80 System](https://www.denso.net/wp-content/uploads/2022/04/Outfall-pipe-at-high-tide.png)
The outfall pipe at high tide prior to the SeaShield 70/80 System application.
![SeaShield 70/80 System](https://www.denso.net/wp-content/uploads/2022/04/APPLICATION-OF-PASTE-S105-AND-MPT.png)
Application of the Denso Paste S105 (bottom right of the image) followed by the SeaShield Marine Piling Tape (to the left).
![SeaShield 70/80 System](https://www.denso.net/wp-content/uploads/2022/04/Polywrap-is-removed-once-GOW-UV-is-fully-cured.png)
The Poly-wrap is removed and safely discarded once the Denso Glass Outerwrap has cured.
![SeaShield 70/80 System](https://www.denso.net/wp-content/uploads/2022/04/Work-in-progress.png)
Undertaking work on the Southend-on-Sea outfall pipe.
![SeaShield 70/80 System](https://www.denso.net/wp-content/uploads/2022/04/Outfall-pipe-at-high-tide.png)
The outfall pipe at high tide prior to the SeaShield 70/80 System application.
![SeaShield 70/80 System](https://www.denso.net/wp-content/uploads/2022/04/APPLICATION-OF-PASTE-S105-AND-MPT.png)
Application of the Denso Paste S105 (bottom right of the image) followed by the SeaShield Marine Piling Tape (to the left).